For over 10 years Mixlance have developed, designed and maintained Coating plants throughout the UK, the following pages take you through a timeline of our most prestigious projects.
The plants are proving to be a viable alternative to conventional asphalt plants, operating under the high demands of major contract requirements but with the proven flexibility to supply local authority work and the 'call and collect' market.
Mixlance have a vision, in partnership with industry that vision is being realised.

MQP Groby
2002 MIDLAND QUARRY PRODUCTS
Groby Quarry – Leicestershire, 80 tonne per hour, 3 tonne low level modular Batch Heater, Coating & Recycling plant. Component design, providing optimum fuel, electricity and additive usage.

AL Bristol
1998 CAMAS AGGREGATES
Urban location at Bristol – South West, providing 80 tonnes per hour.

Ellesmere Port
1997 RMC ROADSTONE LTD
Urban Batch Heater Coating Plant at Ellesmere Port – North West site. Incorporates recycled road planings, conical flame burner providing two stage drying process giving guaranteed optimum pre-coated conditions.

RMC Springett
RMC ROADSTONE LTD (NORTH WEST)
Urban Batch Heater Coating Plant at Springett site – Stoke on Trent, compliant with all current safety code practices and EPA requirements.

MQP Ettingshall
1994 MIDLAND QUARRY PRODUCTS
Urban location at Ettingshall site, unit incorporates a capacity of 300 tonnes of hot materials, controlled and monitored through modern process control.

Al Darlaston
CAMAS AGGREGATES
Urban location at Darlaston - West Midlands, achieving 99% plant availability since its commissioning in 1993

MQP Cliffe Hill
1989 MIDLAND QUARRY PRODUCTS
Twin tower unit at Cliffe Hill quarry – Leicestershire, Quadrae Tech twin Batch Heater with a capacity of 110 tonne/hr from each side. Unit can be used to supply wet mix, non coated material or coloured macadams.

|